Gravesend · 2026 Local Guide

Gravesend Solar Guide: Iron Pier, Article 4 Streets & 10 Verified Installers

10 MCS-listed firms for Gravesend, Northfleet, Meopham, Shorne, Cobham and Istead Rise.

Gravesend sits on the south bank of the Thames, 21 miles east-southeast of Charing Cross. Its Town Pier of 1831–34 is described in its Grade II* listing as probably the earliest surviving iron pleasure pier in the world, and Pocahontas was buried at St George’s Church in 1617. Gravesham, the borough around it, had about 106,900 people at the 2021 Census.

A 4kW roof in Gravesend is modelled to generate 4,112 kWh a year, and each unit you use instead of buying saves 26.88p at the South East cap. Only two MCS-listed installers have an address in DA11–DA13, so the other eight on this list come from Medway, Tonbridge & Malling and Sevenoaks. Each was checked against MCS listings and its own website.

TL;DR: Gravesend’s modelled output for 4kW is about 4,112 kWh a year, worth around £765–£875 annually at South East rates, with payback of roughly 7.4–8.5 years on £6,490. Gravesham has 23 conservation areas with Article 4 directions, and the council runs its own Warm Homes grant with E.ON.
4,112 kWh4kW output in Gravesend
26.88pLocal unit rate (Q4 2026)
£765–£875Value per year
0% VATUntil 31 Mar 2027

At a glance: Gravesend solar installers compared

CompanyAccreditationServicesCoverageYearsBest for
Solar Panels FundedMCS networkQuote matching, solar PV, battery, panel cleaning, funding guidanceGravesend, Northfleet & DA11–DA13—One enquiry → multiple local quotes
KVB Renewables LtdMCS (NICEIC), TrustMarkSolar PV, GivEnergy battery, EV, cleaningMeopham (DA13), ~6 miles—Microinverter systems from a firm that may be in Meopham.
C M C Electrical ServicesMCS (NICEIC)Solar PV (per MCS listing)Sole Street (DA13), ~4 miles—The nearest MCS-listed electrician, if it checks out.
JAW Electrics LtdMCS (NAPIT)Solar PV, EV, rewires, EICRsCliffe (ME3), ~6 milesSince 2017An electrician-led quote from just across the Medway border.
iToo Electrical LtdMCS (NAPIT), RECC, QANWSolar PV, Tesla batteryStrood (ME2), ~6 miles—Tesla Powerwall buyers near Strood.
Swift Solar Solutions LtdMCS (NAPIT), RECC, TrustMarkSolar PV, battery, EV, financeRochester (ME1), ~8 miles—A wide choice of battery brands, with finance.
Sunbright Energy LtdMCS (claimed, not found), NAPIT, TrustMarkSolar PV, battery, EV, air conWrotham (TN15), ~9 milesSince 2014Buyers who will check its MCS certificate first.
PBA Electrical & Renewables LtdMCS (NICEIC), RECC, OZEVSolar PV, battery, EV, electricalAylesford (ME20), ~10 miles—SolarEdge or GivEnergy systems from a general electrician.
LRB Electrical & Renewables LtdMCS (NAPIT), HIES, TrustMarkSolar PV, battery, maintenance, EVDitton (ME20), ~11 miles—Servicing an existing array, or emergency electrical cover.
Unclouded Solar LtdMCS (NAPIT), ECSSolar PV, battery, EV, maintenanceKemsing (TN15), ~11 miles—Buyers who weigh review history most.
Infinite EnergyMCS (NAPIT), RECC, TrustMark, IWASolar PV, battery, EVKings Hill (ME19), ~12 miles—A larger team with a long workmanship warranty.

MCS numbers checked 20 October 2026 against the MCS installer listings (via Find Certified Installers), with services and accreditations checked on each firm’s own site and the RECC, TrustMark, Which? and Checkatrade listings where available. Review figures are the ones shown on those listings. Membership can change, so confirm MCS status with the installer before you sign.

Solar in Gravesend by the numbers

Modelled for a Gravesend roof facing due south at a 35° pitch, a 4kW array should give about 4,112 kWh a year. The best month is July at around 504 kWh, and December drops to about 142 kWh.

JanFebMarAprMayJunJulAugSepOctNovDec
  • 4,112 kWh / yearEstimated output of a 4kW roof system in Gravesend
  • 26.88p per kWhPrice-cap unit rate for Gravesend’s region (South East), Oct–Dec 2026, vs 26.32p GB average
  • £440–£665 off your billIf you use 40–60% of what the panels make at home
  • + £215–£320 export incomeThe rest sold at 13p/kWh on an open Smart Export Guarantee tariff

At South East prices that comes to about £765–£875 a year, so a £6,490 system pays for itself in roughly 7.4–8.5 years. Gravesend edges ahead of Dartford and Brentwood on output and sits just behind Chelmsford.

Sources: output from the EU’s PVGIS 5.3 model (SARAH-3 data) for Gravesend, 4kW, 35° south-facing, roof-mounted, 14% system losses. Unit rate from Ofgem’s price cap for 1 Oct–31 Dec 2026. Export rate: Fuse Energy Single Rate Variable, September 2026. Installed cost: Sunsave, August 2026. Your own figures will depend on roof direction, shading and how much electricity you use in daylight.

Areas covered around Gravesend

This guide covers DA11 (Gravesend west and Northfleet), DA12 (central and east Gravesend, plus Shorne and Cobham) and DA13 (Meopham, Vigo, Southfleet and Istead Rise). Two installers are local: C M C Electrical at Sole Street and, by its directory address, KVB Renewables in Meopham. The other eight travel in from Cliffe, Strood and Rochester in Medway, from Aylesford, Ditton and Kings Hill in Tonbridge & Malling, and from Wrotham and Kemsing in Sevenoaks district.

GravesendNorthfleetMeophamVigoShorneCobhamSouthfleetIstead RiseRiverview ParkWindmill Hill

Postcode sectors from Streetlist (DA11, DA12, DA13); wards and parishes from Wikipedia (Borough of Gravesham); population from ONS Census 2021.

Planning and grid connection in Gravesend

  • 23 conservation areasGravesham has 23 conservation areas, from Riverside, Windmill Hill, Harmer Street and Overcliffe in the town to Meopham Green, Cobham and Shorne in the villages. There are over 300 listed buildings in the borough, among them the Grade II* Town Pier and St George’s Church and the Grade II Pocahontas statue.
  • Article 4 directionsThe council lists Article 4 directions covering 24 confirmed conservation areas and extensions, with Lower Higham pending. Its page doesn’t say which permitted-development rights they remove, so ask the planning team before fitting panels on a roof slope that faces the street. That isn’t the same as solar being restricted.
  • Local PlanThe Core Strategy was adopted in September 2014. A new Local Plan 2042 has reached the Regulation 19 proposed-submission stage. The council declared a climate emergency in June 2019 and aims for a net-zero borough by 2030.
  • Tidal flood riskGravesend and Northfleet are an Environment Agency tidal flood warning area. Of the borough’s 12 km of shoreline, 6 km is protected by the Thames tidal wall and the rest by earth embankments; Riverside ward is among the low-lying areas behind them.
  • UK Power NetworksGravesend should be on UK Power Networks’ South Eastern network. A typical home array is reported to the network once it is live under G98; bigger systems or inverters need G99 consent before installation.

Sources: Gravesham Borough Council (conservation areas, Article 4 directions, listed buildings, Local Plan, Journey to Net Zero, Climate Change Strategy v3, grants and assistance, news); Historic England list entries 1089004 and 1057700; Kent County Council flood risk to communities in Gravesham (2017); Environment Agency flood area 064FWT1Gravesend; GOV.UK Warm Homes: Local Grant allocations; UK Power Networks; Wikipedia (Gravesend, St George’s Church).

1

Solar Panels Funded

MCS networkResidential & commercialFunding specialists

Solar Panels Funded is a Birmingham-based solar intermediary at Digbeth Court Business Centre, 162–164 High Street, Birmingham, B12 0LD. It doesn’t install panels itself; it matches Gravesend homeowners with MCS-accredited installers from its network, so one enquiry brings back several quotes.

Because so few MCS firms are based in Gravesham, it can bring in installers from across north and west Kent, and ask them to check Article 4 and conservation-area status before they design a roof.

Get your free Gravesend quote →

Best for One enquiry → multiple competitive quotes from vetted MCS-accredited installers.

2

KVB Renewables Ltd

MCSNICEICTrustMark

KVB Renewables describes itself as a family-run business covering Kent and the South East. It fits home and commercial solar PV with Longi panels, Enphase IQ8 microinverters and Renusol mounting, plus GivEnergy batteries, EV chargers, bird guards, maintenance and panel cleaning.

We found no rating on its MCS listing and just two five-star reviews on Renewable Energy Hub, written in near-identical words under the same name. Its address is also unclear: directories place it in Meopham (DA13), but its MCS listing gives 1 Lacey Close, Langley ME17 3LA, about 17 miles away, so ask which base would handle your job.

Best for Microinverter systems from a firm that may be in Meopham.

3

C M C Electrical Services

MCSNICEIC

C M C Electrical Services is based at Sole Street in Cobham parish, the closest MCS-listed firm to Gravesend town centre, and appears under solar PV on the MCS-mirroring installer list.

We couldn’t find a website or any reviews, so solar work isn’t confirmed beyond that listing. Ask for photos of recent installs, references, proof of insurance and its MCS certificate.

Best for The nearest MCS-listed electrician, if it checks out.

4

JAW Electrics Ltd

MCSNAPIT

JAW Electrics was founded in 2017 and works from Cliffe on the Hoo peninsula, with a team led by Jamie. Alongside solar PV it does EV chargers, rewires, EICRs and consumer units; a solar directory adds batteries, JA Solar panels and Growatt inverters, though its own site doesn’t mention storage.

Its MCS listing shows 5.0 from 15 Google reviews. It names Rochester, Maidstone and Sevenoaks among its areas but not Gravesend, so confirm it will travel west.

Best for An electrician-led quote from just across the Medway border.

5

iToo Electrical Ltd

MCSNAPITRECCTesla

iToo Electrical, in Strood, designs and installs solar PV and battery systems and is a Tesla Approved Installer, with an insurance-backed warranty through QANW. It says it was established over ten years ago.

We found no reviews, and its website is thin, with no phone number or service area; contact is by a Yahoo email address. Ask for references and a written specification.

Best for Tesla Powerwall buyers near Strood.

6

Swift Solar Solutions Ltd

MCSNAPITRECCTrustMark

Swift Solar Solutions is a Rochester solar firm that claims 15 years’ experience. It installs home and commercial solar, batteries and EV charging, using brands including Tesla Powerwall 3, Fox ESS, Sigenergy, SunPower Maxeon and Jinko, and advertises finance of up to 100%.

Its MCS listing shows 5.0, but from a single Google review, so that score tells you little. Ask for recent local references.

Best for A wide choice of battery brands, with finance.

7

Sunbright Energy Ltd

MCS (claimed)NAPITTrustMarkQANW

Sunbright Energy is a family-run Wrotham firm founded in 2014, with director Oliver Crouch, that claims over 2,500 installations across Kent, Essex, London, Surrey and Sussex. It fits solar, batteries, inverters, myenergi and Tesla EV chargers and air conditioning, and is a Fox ESS Approved Partner.

Trustatrader shows 4.96 from 12 reviews, while the firm itself claims five stars from 500+. Its website says it is MCS certified, but we could not find its MCS number on the installer register, so ask for its certificate and check it on mcscertified.com before you sign.

Best for Buyers who will check its MCS certificate first.

8

PBA Electrical & Renewables Ltd

MCSNICEICRECCOZEV

PBA Electrical & Renewables is an Aylesford NICEIC Approved Contractor that installs solar PV, batteries and EV chargers as well as full domestic and commercial electrical work. Its site shows SolarEdge, GivEnergy and Tesla Energy logos, and it is an Octopus Trusted Partner offering IWA-backed warranties.

There is no rating on its MCS listing. A Trustpilot page exists, but we didn’t read a review count, so look at it yourself.

Best for SolarEdge or GivEnergy systems from a general electrician.

9

LRB Electrical & Renewables Ltd

MCSNAPITTrustMarkHIES

LRB Electrical & Renewables was set up by Lewis Ellerby, who has over 14 years of experience, and works across Kent and South London. It installs solar PV and batteries, maintains existing arrays, fits Zaptec EV chargers and offers rewires and a 24/7 call-out.

We found no reviews, and no phone number on its homepage. It doesn’t name Gravesend in its coverage, so ask about travel and aftercare.

Best for Servicing an existing array, or emergency electrical cover.

10

Unclouded Solar Ltd

MCSNAPITECS

Unclouded Solar is a Kemsing firm near Sevenoaks covering Kent, Sussex and Essex, with Dartford named among its areas. It installs home and commercial solar, maintenance and car chargers; a directory adds batteries, Phono Solar panels and Growatt or SOFAR inverters.

Its MCS listing shows 5.0 from 80 Google reviews, the best record on this list. Its “number one” and “best prices” claims are marketing, so judge it on the quote.

Best for Buyers who weigh review history most.

11

Infinite Energy

MCSNAPITRECCTrustMark

Infinite Energy, run by managing director Tom Forster, installs home and business solar, batteries and EV chargers across Kent, Greater London and East Sussex, using Sigenergy and SolaX kit. It gives a 10-year workmanship warranty and IWA cover, and its office is at The Packhouse, East Malling.

Its MCS listing shows 4.9 from 49 Google reviews. That listing is under Infinite Energy Home Ltd while its website names Infinite Energy Group Ltd; the address matches, but check which company signs your contract.

Best for A larger team with a long workmanship warranty.

Frequently Asked Questions

Is there a solar grant from Gravesham council?

Yes, potentially. Gravesham received £1,117,648 of Warm Homes: Local Grant funding as a standalone council and delivers it with E.ON, and solar panels are among the measures. The home must be rated EPC D–G, and the household must either earn under £36,000 gross or claim a means-tested benefit. Gravesham gives no update on remaining places, so phone E.ON Green Funding Solutions on 033 3202 4820 before you rely on it.

Do Article 4 directions in Gravesend stop me fitting panels?

Not necessarily. Article 4 directions apply across 24 of the borough’s confirmed conservation areas, including Riverside, Windmill Hill and Darnley Road, with Lower Higham still pending. The council’s page lists the directions but not what each one removes, so email planning.admin@gravesham.gov.uk before panels go on a street-facing slope. Listed buildings, of which Gravesham has over 300, need consent anyway.

How does Gravesend’s solar output compare with Dartford?

At 4,112 kWh a year for 4kW facing south, Gravesend just edges Dartford and Brentwood (4,097 kWh) in PVGIS and trails Chelmsford (4,131 kWh) only slightly. July brings roughly 504 kWh; December manages just 142 kWh.

What would panels be worth to a Gravesend home?

South East households pay 26.88p a unit, so a 4kW system is worth roughly £765–£875 a year, the exact figure depending on how much you use while the sun is up. Divide that into a £6,490 cost and you recover the outlay in about 7.4–8.5 years.

Is the council putting solar on Gravesham homes?

On its own housing, yes. In March 2025 Gravesham won £2.1m from the Warm Homes: Social Housing Fund towards heat pumps and solar PV for 204 council homes, and a further award announced in March 2026 covers 240 homes. The council’s climate strategy talks about supporting community-led schemes like local solar farms, though no community energy group in Gravesham showed up in our research. Kent’s 2025 Solar Together round closed to registrations on 6 June 2025.

I live near the river in Gravesend. Does flood risk matter?

It shouldn’t stop you, but it should shape the layout. The Environment Agency covers Gravesend and Northfleet with a tidal flood warning area, and only half the borough’s 12 km of shoreline sits behind the Thames tidal wall. In Riverside ward or similar low ground, ask for the inverter, battery and isolators to be mounted well above floor level.

Why are so few installers on this list based in Gravesend?

Just two solar firms on the MCS data we could read are based in DA11–DA13, and one has neither a website nor reviews. Everyone else on the list travels in from Medway, Tonbridge & Malling or Sevenoaks, typically 6–12 miles. Check each one’s MCS certificate and public liability cover, speak to two recent customers, and confirm whether its own team or a subcontractor will carry out the work.

Final Thoughts

Before you ask for quotes in Gravesend, find out whether your street is in one of Gravesham’s 23 conservation areas and covered by an Article 4 direction, and check your EPC rating in case the E.ON-run grant applies.

Compare at least three quotes, ideally one from a DA13 firm and two from further afield, and test each installer’s generation figure for your roof against the 4,112 kWh estimate above.

Related reading on Solar Panels Funded

Dartford Solar Panel Installers: 10 Verified Firms Compared for 2026
Gravesend · 2026 Local Guide Gravesend Solar Guide: Iron Pier,…
Burnley Solar Panel Installers: 10 Verified Firms Compared for 2026
Gravesend · 2026 Local Guide Gravesend Solar Guide: Iron Pier,…

Check your postcode for solar panel grants and funding available in your area (homeowners only)