Liverpool Solar Guide: Article 4 Conservation Roofs, a Waiting List for Warm Homes Grants & 10 Verified Installers
10 solar firms checked against MCS records for Liverpool city centre, Everton, Wavertree, Allerton, Woolton, Garston & Speke.
Liverpool grew from a borough created by King John’s letters patent in 1207 into one of the great Atlantic ports: its first wet dock opened in 1715, and the Royal Albert Dock introduced the first non-combustible warehouse system. It became a city in 1880. The waterfront was inscribed as a World Heritage Site in 2004, but UNESCO deleted Liverpool Maritime Mercantile City from the list on 21 July 2021, citing development at Liverpool Waters and the Bramley-Moore Dock stadium. The city sits on sandstone ridges along the east bank of the Mersey, and the 2021 Census counted 486,100 residents, 4.2% more than in 2011.
A south-facing 4kW array here should generate about 3,746 kWh a year. The local network belongs to SP Energy Networks, and Liverpool homes pay the North Wales & Mersey price-cap unit rate of 27.86p, one of the highest in Great Britain, so each kWh you use yourself is worth a little more than elsewhere. Six of the ten firms below are within two miles of the centre, from Norfolk Street and Jamaica Street out to Edge Hill, Everton and the north docks. The other four are in south Liverpool and Fazakerley. We checked each against MCS certificate numbers published by Propertoasty’s installer directory, Companies House and the firms’ own websites. Two firms also appear in our Widnes guide, and a few have very short review histories, and we say so where it applies.
At a glance: Liverpool solar installers compared
| Company | Accreditation | Services | Coverage | Years | Best for |
|---|---|---|---|---|---|
| Solar Panels Funded | MCS network | Quote matching, solar PV, battery, panel cleaning, funding guidance | Liverpool, Wavertree & Woolton | — | One enquiry → multiple local quotes |
| Generating Energy Ltd | MCS NAP-74298 | Solar PV, battery, EV | Queens Dock (L1), ~0.5 miles | Since 2023 | Best for a city-centre firm with plenty of recent reviews |
| Complete Home Energy Solutions Ltd | MCS (NAP-194011 as listed) | Solar, battery, heat pumps | Jamaica Street (L1), ~0.5 miles | Since 2011 | Best for combining solar with a heat pump |
| Glyn Nuttall Ltd | NICEIC, ECA | Solar, battery, EV, electrical | Edge Hill (L7), ~1 mile | Since 1947 | Best for an old-established electrical contractor |
| Northern Solar Ltd | MCS NIC-4132 | Solar, battery, maintenance | Everton (L6), ~1.6 miles | Since 2002 | Best for long local experience and system servicing |
| Feed It Green Ltd | MCS NAP-17819 | Solar PV, battery, EV, O&M | Boundary Street (L5), ~1.7 miles | Since 2011 | Best for homes and small business roofs |
| Advanced Building Service Solutions Ltd | MCS NIC-601186 | Solar PV | Waterfront North (L5), ~2 miles | Since 2006 | Best for a local electrical contractor |
| Conscious Energy Ltd | MCS NAP-31827 | Solar, battery, heat pumps | Penny Lane ward (L18), ~2.7 miles | Since 2019 | Best for whole-house retrofit in south Liverpool |
| ACC Renewable Energy Ltd | MCS NAP-31382 | Solar, battery, EV, heat pumps | Fazakerley (L9), ~4.2 miles | Since 2020 | Best for a well-reviewed north Liverpool firm |
| QuantumSolarUK Ltd | MCS NAP-75961 | Solar PV, commercial focus | Woolton (L25), ~5.9 miles | — | Best for larger or more technical systems |
| Zenith Eco Solutions Ltd | MCS NIC-600466 | Solar, battery, EV, heat pumps | Hunts Cross (L24), ~6.1 miles | Since 2018 | Best for a solar and Powerwall package |
MCS numbers checked 10 November 2026 against the MCS installer listings (via Find Certified Installers), with services and accreditations checked on each firm’s own site and the RECC, TrustMark, Which? and Checkatrade listings where available. Review figures are the ones shown on those listings. Membership can change, so confirm MCS status with the installer before you sign.
Solar in Liverpool by the numbers
PVGIS modelling for a 4kW array tilted at 35° and facing due south over Liverpool gives 3,746 kWh a year. Output peaks at 486 kWh in May and drops to 110 kWh in December.
- 3,746 kWh / yearEstimated output of a 4kW roof system in Liverpool
- 27.86p per kWhPrice-cap unit rate for Liverpool’s region (North Wales & Mersey), Oct–Dec 2026, vs 26.32p GB average
- £415–£625 off your billIf you use 40–60% of what the panels make at home
- + £195–£290 export incomeThe rest sold at 13p/kWh on an open Smart Export Guarantee tariff
Valued at the North Wales & Mersey unit rate of 27.86p, with surplus exported at 13p, that output produces the savings range above. Liverpool edges just ahead of Birkenhead across the river (3,721 kWh) and is clearly ahead of Knowsley (3,674 kWh), Runcorn (3,658 kWh) and Widnes (3,649 kWh), so the open Mersey estuary does not cost you sunshine. On the city’s tightly packed terraces, shading from chimneys, dormers and the house next door will decide your yield far more than the postcode.
Sources: output from the EU’s PVGIS 5.3 model (SARAH-3 data) for Liverpool, 4kW, 35° south-facing, roof-mounted, 14% system losses. Unit rate from Ofgem’s price cap for 1 Oct–31 Dec 2026. Export rate: Fuse Energy Single Rate Variable, September 2026. Installed cost: Sunsave, August 2026. Your own figures will depend on roof direction, shading and how much electricity you use in daylight.
Areas covered around Liverpool
L1 and L2 cover the city centre, Canning, Brownlow Hill and Festival Gardens, and L3 runs along the waterfront and through Vauxhall and Everton West. L4 is Anfield, Walton, Kirkdale, Clubmoor and Tuebrook, L5 takes in Everton, Kirkdale, Vauxhall and Waterfront North, and L6 covers Everton, Anfield, Kensington & Fairfield and Tuebrook. L7 is Edge Hill, Kensington, Fairfield and Old Swan West, and L8 covers Toxteth, Dingle, Princes Park and the edge of Sefton Park. In the north and east, L11 is Norris Green, Croxteth, Clubmoor and Fazakerley, L12 is West Derby, Croxteth Country Park and Broadgreen, L13 is Old Swan, Stoneycroft, Tuebrook and Wavertree, and L14 runs from Broadgreen to Knotty Ash. L15 covers Wavertree, Penny Lane and Smithdown, L16 Childwall, Gateacre and Belle Vale, L17 Aigburth, Sefton Park and St Michael’s, L18 Allerton, Mossley Hill and Calderstones, and L19 Garston, Grassendale and Cressington. In the south, L24 is Speke, Garston and Hunts Cross, L25 Woolton, Gateacre and Belle Vale, and L27 Netherley and Belle Vale. Generating Energy and Complete Home Energy Solutions are both about half a mile from the centre. Glyn Nuttall, Northern Solar, Feed It Green and Advanced Building Service Solutions are 1–2 miles out. Conscious Energy’s MCS address is about 3 miles away, ACC Renewable Energy is about 4 miles north, and QuantumSolarUK and Zenith Eco Solutions are about 6 miles to the south-east.
City CentreEvertonAnfieldKensingtonEdge HillToxtethWest DerbyWavertreeAigburthAllertonWooltonGarstonSpeke
Sources: postcodes.io outcode data for L1–L9, L11–L19, L24, L25 and L27; Wikipedia, Liverpool (districts). Distances are straight-line from the L1 district centroid, calculated from postcodes.io coordinates for each firm’s postcode.
Planning and grid connection in Liverpool
- Conservation areasLiverpool City Council lists 36 conservation areas covering 9% of the city and about 19,000 properties. They range from the Georgian streets of Canning Street and Rodney Street to suburban Sefton Park, Mossley Hill, Woolton Village and Wavertree Garden Suburb. Losing World Heritage status in 2021 did not lift any local protection: Albert Dock, Stanley Dock, Castle Street, Duke Street and William Brown Street are still conservation areas. Under national rules, roof panels in a conservation area are normally permitted development if they are placed to keep their visual impact low, but panels on a wall that faces a highway need planning permission.
- Article 4 directions & listed buildingsThis is where Liverpool differs from most places. The council says most of its conservation areas are covered by Article 4 directions, and the works that may then need permission include the roof and roof coverings, chimneys, dormers and rooflights, windows, doors and cladding. In Kensington Fields, Knotty Ash, Toxteth Park and the Avenues, the directions apply only to elevations fronting a highway. Everywhere else they apply to every elevation, including the back. The council’s page does not mention solar panels by name, so ask Planning and Building Control whether your direction covers them before you sign a contract. The city’s separate HMO Article 4 directions deal with change of use and do not affect solar. Liverpool has more than 2,500 listed buildings (1,471 list entries, 29 of them Grade I), and any listed home needs listed building consent.
- Local planThe Liverpool Local Plan 2013–2033 was adopted on 26 January 2022, and the council is now preparing a replacement Local Plan 2043. For a standard home, these plans matter less than the conservation and Article 4 rules above. They become relevant if you want a ground-mounted array, panels on a flat or a block, or a system on commercial premises.
- Local solar projectsAt the Port of Liverpool’s Alexandra Dock, E.ON and Peel Ports connected 6,926 panels on the 260,000 sq ft “Alex Shed” in January 2026. That is the first stage of a project that could reach 48,000 panels and 25MW. In the city centre, the Grade II listed Liverpool Parish Church (Our Lady and St Nicholas) fitted 56 panels producing about 21kW on a sunny day after church approval in 2024. Liverpool South Parkway station has a 12.375kWp solar façade installed by Polysolar, and Statkraft’s £25m Lister Drive Greener Grid Park in Tuebrook helps keep the grid stable as solar and wind output rises and falls.
- The grid: SP Energy NetworksSP Energy Networks runs the cables under Liverpool, as the distributor for Cheshire, Merseyside and North Wales. A typical home system with an inverter up to 3.68kW per phase is simply notified under G98 within 28 days of switch-on. A bigger inverter, or a battery that would push export above that limit, needs a G99 application and approval before installation. Make sure your installer says which one applies and who is submitting it.
Sources: Sources: Liverpool City Council conservation areas, Article 4 directions and plan-making pages; Wikipedia, Liverpool Maritime Mercantile City and Grade I listed buildings in Liverpool; E.ON news release, 22 January 2026; Liverpool Diocese (St Nick’s solar), July 2024; Polysolar project page; Place North West, 24 February 2022; Energy Networks Association, find my network operator.
Solar Panels Funded
MCS networkResidential & commercialFunding specialists
Solar Panels Funded is a Birmingham-based solar intermediary at Digbeth Court Business Centre, 162–164 High Street, Birmingham, B12 0LD. It doesn’t install panels itself; it matches Liverpool homeowners with MCS-accredited installers from its network, so one enquiry brings back several quotes.
That helps in a city where so many streets sit in conservation areas with Article 4 roof controls. Several quotes let you see which installers raise the planning question before they survey, and which can design for a narrow terraced roof with chimney shading. It is also worth comparing firms with long review histories against newer local companies whose ratings rest on only a handful of jobs.
Get your free Liverpool quote →
Best for One enquiry → multiple competitive quotes from vetted MCS-accredited installers.
Generating Energy Ltd
MCSNAPITTrustMarkHIES
Generating Energy is the closest certified firm to the city centre, working from a business centre on Norfolk Street. Propertoasty lists it with MCS number NAP-74298 for solar PV, and its website covers solar, battery storage and EV charging, with MCS, TrustMark, NAPIT and HIES logos. Companies House shows the company was incorporated on 29 June 2023 at the same address.
Propertoasty shows a 5.0 Google rating from 86 reviews, which is a lot for a young company. Because it has only been trading since 2023, ask how long its workmanship warranty lasts and whether HIES deposit and warranty insurance protects it.
Best for Best for a city-centre firm with plenty of recent reviews
Complete Home Energy Solutions Ltd
MCSNAPITWhich?
Complete Home Energy Solutions fits solar panels, batteries, air source heat pumps and EV chargers, and also offers Tepeo zero-emission boilers and Sunamp heat batteries. Its registered office is at Basecamp on Jamaica Street. Propertoasty lists its MCS registration (number shown as NAP-194011) at a south Liverpool address, L19 9BR. Companies House shows it was incorporated in November 2011.
It is a Which? Trusted Trader with a 5.0 score from 79 reviews, and Which? lists solar panels and solar maintenance among its services. Much of its business is heating, so ask how many solar jobs it has completed in the past year. Its MCS number looks unusual, so confirm it on the MCS register.
Best for Best for combining solar with a heat pump
Glyn Nuttall Ltd
NICEICMCSECA
Glyn Nuttall is the longest-established firm here. Its website says it was founded in 1947, has been an NICEIC member since 1957, and is the fifth-oldest member of the Electrical Contractors’ Association in Liverpool and District. It does commercial and domestic electrical work and EV chargers. Its solar examples include a 5kW inverter with a 9.5kWh GivEnergy battery in Garston and a 5.2kW bifacial array.
The website shows NICEIC, ECA, Constructionline, MCS and GivEnergy logos and a 4.4 Google rating, but gives no review count. We could not find it in the MCS-based directory we used. A related company, Glyn Nuttall Solar Ltd, was set up in 2011. Ask for its current MCS certificate number before you book a survey.
Best for Best for an old-established electrical contractor
Northern Solar Ltd
MCSNICEIC
Northern Solar says it has been installing since 2006 and was one of Merseyside’s earliest solar PV companies. It offers residential solar, battery storage, EV chargers and maintenance from an office off Breckfield Road South in Everton. Propertoasty lists its MCS number as NIC-4132, and Companies House shows the company was incorporated on 2 October 2002. Its featured project is a large rooftop PV system at Alder Hey Children’s Hospital.
Propertoasty shows 5.0 on Google from 12 reviews. That is a small count for a firm with this much history, so ask to see examples of recent domestic jobs. Its maintenance service could also be useful if you already own an older system that needs a new inverter.
Best for Best for long local experience and system servicing
Feed It Green Ltd
MCSNAPITRECCTrustMark
Feed It Green works from Box Studios on Boundary Street, with further offices in Manchester and Conwy. It installs solar PV, batteries and EV chargers, and offers operations and maintenance. Its site gives NAPIT/MCS number 17819, which Propertoasty lists as NAP-17819. Companies House shows the company was incorporated in September 2011. Its case studies include Kingsley Community School and buildings for Autism Initiatives.
Propertoasty shows 4.8 on Google from 24 reviews. Much of its published work is commercial or public-sector, so ask for a domestic reference near you and confirm who will carry out the installation itself.
Best for Best for homes and small business roofs
Advanced Building Service Solutions Ltd
MCSNICEIC
Advanced Building Service Solutions is an electrical, plumbing and building-services contractor. Propertoasty lists it with MCS number NIC-601186 for solar PV at an L5 9PR address in the Waterfront North ward. Companies House shows it was incorporated in March 2006 as Advanced Electrical (Merseyside) Ltd and changed its name in 2021.
Propertoasty shows a single 5-star Google review, and we found no website, so there is very little public evidence of its solar work. Ask for its MCS certificate, photos of finished arrays and a written quote that names the panels and inverter.
Best for Best for a local electrical contractor
Conscious Energy Ltd
MCSNAPITTrustMark
Conscious Energy installs solar PV, batteries, air source heat pumps, EV chargers, roofing and insulation, and its website claims more than 1,000 installs. It names TrustMark, MCS and NAPIT and says it is an Octopus trusted installer. Propertoasty lists it with MCS number NAP-31827 at an L18 1DG address in the Penny Lane ward, while its website gives a unit on Speke Hall Road. SurgePV’s directory gives 2019 as its founding year.
Propertoasty shows 5.0 on Google from only 6 reviews, which is a thin record for a firm claiming more than 1,000 installs. Ask which address will handle your aftercare, and request references from recent south Liverpool customers.
Best for Best for whole-house retrofit in south Liverpool
ACC Renewable Energy Ltd
MCSNAPITRECCTrustMark
ACC Renewable Energy installs solar PV, batteries, EV chargers and air source heat pumps for homes and businesses. Its website footer gives MCS registration NAP-31382, which matches Propertoasty’s listing. It shows TrustMark, NAPIT and RECC logos and names Kevin Boyle as MCS nominated person. Companies House shows the company was incorporated on 10 July 2020, and its address in the Fazakerley West ward is just outside the core districts this guide covers.
Propertoasty shows 5.0 on Google from 173 reviews, the strongest record of any firm here. Its website advertises solar packages “from £2,995”. Treat that as an entry price and compare like-for-like quotes for panel count, inverter and battery.
Best for Best for a well-reviewed north Liverpool firm
QuantumSolarUK Ltd
MCSNAPIT
QuantumSolarUK also appears in our Widnes guide. It is based off Mackets Lane in the Much Woolton & Hunts Cross ward, and Propertoasty lists it with MCS number NAP-75961 for solar PV. When we profiled it for Widnes, the firm described itself as mainly a commercial solar, battery and grid-connection business that takes on selected domestic installations with MCS sign-off.
Propertoasty shows no rating for it, and its website could not be read when we checked. Ask whether it is currently taking home installations and how long its lead time is.
Best for Best for larger or more technical systems
Zenith Eco Solutions Ltd
MCSTrustMark
Zenith Eco Solutions also appears in our Widnes guide. It installs solar PV, battery storage including Tesla Powerwall, EV chargers, air source heat pumps, boilers and insulation, and has announced a partnership with OVO Solar & Heating. Propertoasty lists it with MCS number NIC-600466. Companies House shows the company was incorporated on 1 August 2018.
Its website claims a 4.8 rating from more than 200 homeowners without naming the platform, and Propertoasty shows no Google rating. Ask where its reviews are published, and check that any finance offer is clear and regulated.
Best for Best for a solar and Powerwall package
Frequently Asked Questions
Do I need planning permission for solar panels in a Liverpool conservation area?
Possibly, and more often than in most cities. The council says most of its 36 conservation areas have Article 4 directions that bring roof and roof-covering changes under planning control. Outside Kensington Fields, Knotty Ash, Toxteth Park and the Avenues, they apply to every elevation, not just the front. The council’s page does not name solar panels, so ask Planning and Building Control whether your direction covers them. Panels on a wall facing a highway in any conservation area need permission.
Did losing World Heritage status change the rules for my house?
No. UNESCO removed Liverpool Maritime Mercantile City from its list on 21 July 2021, but the planning protection comes from UK law, not UNESCO. Albert Dock, Stanley Dock, Castle Street, Duke Street and William Brown Street are all still conservation areas, and their listed buildings still need listed building consent.
How much will a 4kW system produce in Liverpool compared with nearby towns?
Modelled at 35° and facing south, a 4kW system in the city makes about 3,746 kWh annually. That is slightly more than Birkenhead (3,721 kWh) and around 90–100 kWh more than Knowsley, Runcorn or Widnes. At the North Wales & Mersey rate of 27.86p, it works out at roughly £710–£820 a year, with a payback of 7.9–9.1 years.
Can I get a Warm Homes grant for solar in Liverpool?
Liverpool City Council runs the Warm Homes: Local Grant itself, with £5.8m from DESNZ to upgrade about 450 homes over three years. Solar PV and batteries are eligible measures. Your home must have an EPC rating of D to G, and you must qualify by postcode, benefits or household income below £36,000. Year two, to 31 March 2027, is full. You can register interest for year three, from 1 April 2027, through the GOV.UK portal. The council cannot take applications by email or phone to Healthy Homes.
Will solar work on a Victorian terrace in Wavertree or Kensington?
Usually, but plan around the roof. Propertoasty’s analysis of EPC data for L15 found 56% of homes are mid-terraces, and many have chimney stacks, rear outriggers and dormers that cast shade. Ask installers to model shading on each roof face, to consider optimisers or microinverters where only part of the roof is clear, and to check whether your Article 4 area covers the rear roof as well as the front.
Is there a group-buying scheme in Liverpool?
Solar Together has run in the Liverpool City Region. Sunsave, citing the Combined Authority, reports that three rounds had arranged panels for 1,053 households and that a fourth round ran in October and November 2025. Check the Solar Together site for whether a new round is open, and compare its price with two or three direct quotes from the firms above.
Why does this list include firms from outside the city centre and two from another guide?
We limited this guide to solar firms based in Liverpool’s own postcode districts that were not already used in other local guides, and found seven; six have an MCS number in the directory we used, while Glyn Nuttall shows the MCS logo but we couldn’t find its number. ACC Renewable Energy, the eighth, is in L9, just outside those districts. QuantumSolarUK and Zenith Eco Solutions also appear in our Widnes guide because they are based in south Liverpool. Several firms, including Advanced Building Service Solutions and Conscious Energy, have only a handful of public reviews, so weigh them accordingly.
Final Thoughts
Start by checking whether your street is in one of Liverpool’s 36 conservation areas and what its Article 4 direction covers. The council’s Article 4 map or Planning and Building Control can tell you before an installer climbs the scaffold. If your home is listed, plan for listed building consent. If you might qualify for the Warm Homes grant, register interest now for the round that opens on 1 April 2027.
Then get at least three quotes, including one from a firm with a long review history, such as ACC Renewable Energy or Generating Energy. A well-placed 4kW system in Liverpool should give you about 3,746 kWh a year. Ask each installer to show how chimney and neighbour shading changes that figure, and whether your design needs a G98 notification or a G99 application to SP Energy Networks.
Related reading on Solar Panels Funded

Solar Energy Funding Specialist & Home Energy Advisor
Zachariah Eaton is a UK-based solar energy funding specialist with a focus on helping homeowners access grants, financing schemes, and cost-saving renewable solutions. He has spent years researching government-backed programmes such as ECO4, Smart Export Guarantee (SEG), and local funding initiatives to make solar more accessible. Zachariah writes practical, easy-to-understand guides that help households reduce energy bills and transition to clean energy with confidence.